Final result of all the belting running through the first floor, in the Iron products building. There’s 3 input lines of Iron Ingot, and 4 output lines, one each of Iron Plate, Iron Rod, Iron Wire, and Iron Pipe.

Last building I need for the moment is to house Assemblers for the Modular Frames themselves, and the footprint of this building is slightly different from the others, so it’s back to the blueprinter.

And there we go.

Bottom floor only needs 1 Assembler to round out a total of 10.

Next up is to lay all the mines for Iron Ore and Limestone (11 in total), so I wanted to go ahead and lay in the main tubeway first, to clarify where I can and can’t run beltwork for those. Plus, a few of them will need to belt ALONG the tubeway. Also, I’ll need it for power.

Slight modification to this segment of tubeway, compared to the rest, in that there is no ceiling. It just attaches directly to the underside of this factory.

I’ll probably also go ahead and tidy up this logistics floor, before getting the ores pulled in, so I can have some lighting while I work.